Blueprint takeoffs. Professional bids. Change orders that hold up. IronKit gives electrical contractors the documentation tools to bid faster, win more work, and cut the spreadsheet habit.
No credit card required · All 15 tools includedFrom reading plans to generating change orders and field reports — IronKit handles the documentation side so you can focus on the work.
Upload a blueprint (PDF or photo) and IronKit extracts conduit runs, panel schedules, and device quantities — then formats a complete electrical material takeoff for your estimate.
Open Blueprint Analyzer →Describe the scope — new construction, service upgrade, panel replacement, lighting retrofit — and get a professional bid in seconds. Includes labor, materials, overhead, and markup. Shareable link or PDF.
Open Quote Writer →Calculate cycle time and cost per part for plasma, laser, waterjet, and oxy-fuel cutting. Useful for prefab shops or when you're subbing out panel fabrication and need to verify a quote.
Open CNC Calculator →When the scope changes mid-job, generate a professional change order with cost justification, original contract reference, and adjusted totals. Tracks alongside the original quote.
Open Change Orders →Here's what a typical Blueprint Analyzer output looks like for electrical work. Upload the plans and get a structured material list — no manual counting.
ELECTRICAL MATERIAL TAKEOFF Project: Office Buildout — Level 3 Blueprint: elec-floor3-rev2.pdf PANEL SCHEDULE (SUMMARY) MP-3A: 200A, 208Y/120V, 42-space Load: 18,400 VA (continuous) + 26,400 VA (non-cont) Demand: 52,800 VA → 254A → 200A main breaker CONDUIT RUNS (3/4" EMT — Type NM where allowed) 20A CT runs: 38 × #12 THHN (14,520 ft total) 20A CT runs: 12 × #12 THHN (3,840 ft total) 30A dryer: 4 × #10 THHN (1,520 ft) Panel feed: 2 × #2/0 XHHW-2 (200 ft) DEVICE QUANTITIES Duplex receptacles: 84 pcs GFCI (kitchen/bath): 18 pcs Lights: 42 pcs (20A circuit) Data drops: 24 pcs ✓ Formatted for estimating use
IronKit isn't just estimating — it handles daily field reports, toolbox talks, and change order documentation in one subscription.
Download our free electrical bid template — formatted for licensed electricians and electrical contractors. Includes labor rates, material markup, permit fees, and overhead. Fill in your numbers and send.
Download free template →Document site conditions, crew size, work completed, and delays every day. Clean reports ready for owner submittals or GC documentation requests.
Open Field Reports →No per-document fees. No per-user seats. One flat rate covers your whole shop.
No credit card required. Cancel anytime.
Start your free trial and generate your first blueprint takeoff or bid in under 5 minutes.
Start free trial — no card needed