Example Gallery

See What IronKit Generates —
Real Output, Every Trade

No mockups. No generic screenshots. These are real IronKit outputs across quotes, WPS documents, weld cost calculations, and bid templates — structural, pipe, aluminum, stainless, and sheet metal.

58
Examples
5
Trades
4
Tool Types
10
Paid Tools
Trade
Tool
58 examples
📋 Quote Writer
StructuralQuote Writer

Structural Steel Staircase Quote — $6K

A complete bid package for a 14-step interior steel staircase with handrail and landing. Materials list, labor breakdown, and 22% markup — ready to send in 12 minutes.

See example
📋 Quote Writer
StructuralQuote Writer

Mezzanine Platform Quote — $8K

Shop-fabricated mezzanine platform quote covering W-beam framing, grating, and on-site erection. IronKit split the labor into shop and field rates automatically.

See example
📋 Quote Writer
StructuralQuote Writer

Steel Handrail System Quote — $11K

Industrial handrail system across three floors of a warehouse addition. Per-foot pricing, finish schedule, and OSHA clearance note included in the output.

See example
📋 Quote Writer
StructuralQuote Writer

Structural Beam Job Quote — $47K

Multi-span W14 beam framing with column bases and moment connections. Detailed materials list, 847 LF of weld tracked, and a 19% margin built in.

See example
📋 Quote Writer
StructuralQuote Writer

Steel Warehouse Quote — $62K

Full steel package for a 6,400 sqft pre-engineered warehouse shell. Purlins, girts, and main frames all line-itemed — GC sent a PO the same day.

See example
📋 Quote Writer
StructuralQuote Writer

Industrial Addition Quote — $78K

Structural steel addition to an existing industrial building. New column row, roof extension, and crane rail support — all quoted and won in a single RFI window.

See example
📋 Quote Writer
PipeQuote Writer

Process Piping Quote — $12K

4" Schedule 40 process piping with 23 butt welds and 8 socket welds. API 1104 code compliance noted, per-weld cost from Weld Cost Calculator embedded in the bid.

See example
📋 Quote Writer
PipeQuote Writer

Schedule 40 Pipe Quote — $18K

Mixed-diameter pipe run — 2", 3", and 4" — across a plant expansion. Weld count by size, material takeoff, and field labor distinguished from shop hours.

See example
📋 Quote Writer
PipeQuote Writer

Ornamental Fence Quote — $24K

320 LF of ornamental pipe fence with custom gate and post bases. Finish and coating line items included; quote exported and sent directly from IronKit.

See example
📋 Quote Writer
AluminumQuote Writer

Aluminum Trailer Frame Quote — $9K

Custom 6061-T6 aluminum flatbed trailer frame with aluminum decking. Material cost per foot, TIG weld labor, and anodizing allowance captured in the quote.

See example
📋 Quote Writer
StainlessQuote Writer

Stainless Tank Quote — $14K

304 stainless storage tank for a food-grade application. Sanitary finish note, interior bead blasting, and weld passivation cost all line-itemed and quoted.

See example
📋 Quote Writer
Sheet MetalQuote Writer

Sheet Metal Hood Quote — $7K

Custom 16-gauge stainless exhaust hood for a commercial kitchen. Flat pattern layout, weld seam schedule, and installation allowance all in one quote.

See example
📐 WPS Generator
StructuralWPS Generator

AWS D1.1 GMAW Fillet WPS

AWS D1.1-compliant WPS for GMAW fillet welding on A36 structural plate. All 10 required sections populated — preheat, interpass, PWHT, and position qualification.

See example
📐 WPS Generator
StructuralWPS Generator

AWS D1.1 SMAW Groove WPS

SMAW groove weld procedure for A572 Gr. 50 in the 1G (flat) position. E7018 electrode, 300°F preheat, and complete joint penetration detail in inspector-ready format.

See example
📐 WPS Generator
StructuralWPS Generator

AWS D1.1 FCAW Structural WPS

FCAW-G procedure for heavy structural work on A992 W-shapes. Flux-core wire, dual shielding gas, and a multi-pass sequence for 1" plate — field-ready WPS.

See example
📐 WPS Generator
PipeWPS Generator

Pipe GTAW 6G Chrome WPS

ASME Section IX GTAW procedure for 2" P91 chrome-moly pipe in the 6G position. Root pass amperage, interpass temp limit, and PWHT window all specified per code.

See example
📐 WPS Generator
PipeWPS Generator

Pipe GMAW 45° WPS

GMAW procedure for carbon steel pipe in the 45° inclined fixed (6GR) position. Pulsed MIG, ER70S-6 filler, and a complete variables table for qualification.

See example
📐 WPS Generator
PipeWPS Generator

Pipe SMAW 2G Vertical WPS

SMAW procedure for A106 Gr. B pipe in the 2G (horizontal fixed) position. Low-hydrogen electrode, moisture control note, and API 1104 appendix reference included.

See example
📐 WPS Generator
AluminumWPS Generator

AWS D1.2 GTAW Aluminum WPS

AWS D1.2-compliant GTAW procedure for 6061-T6 aluminum plate. AC current, argon shielding, and a complete essential variables table for structural aluminum applications.

See example
📐 WPS Generator
StainlessWPS Generator

AWS D1.6 Stainless Fillet WPS

AWS D1.6 GMAW procedure for 304L stainless steel fillet welds. ER308L filler, tri-mix shielding gas, and max heat input limit per code.

See example
📐 WPS Generator
StainlessWPS Generator

AWS D1.6 Stainless Groove WPS

AWS D1.6 GTAW groove procedure for 316L stainless. Root purge gas, interpass temp limit, and a back-purge specification for sanitary root bead quality.

See example
📐 WPS Generator
Sheet MetalWPS Generator

Flux Core Heavy Plate WPS

FCAW-S self-shielded procedure for structural heavy plate in outdoor conditions. No shielding gas required — designed for wind-exposed field work on A36.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

Structural Weld Cost — $1/lb

Weld cost breakdown for a structural steel job running at $1.00/lb of weld deposit. GMAW fillet on A36 plate — cost tiles show wire, gas, labor, overhead, and bid price.

See example
💲 Weld Cost Calc
PipeWeld Cost Calc

Pipe Weld Cost Schedule 40

Cost-per-inch calculation for 4" Schedule 40 carbon steel pipe using SMAW. Labor hours per joint, electrode consumption, and gas cost all calculated from actual weld geometry.

See example
💲 Weld Cost Calc
AluminumWeld Cost Calc

Aluminum Weld Cost Thin Gauge

Weld cost analysis for .090" 6061-T6 aluminum using GTAW. Heat input calculated with 0.6 thermal efficiency factor — benchmark badge shows cost vs. industry average.

See example
💲 Weld Cost Calc
StainlessWeld Cost Calc

304 Stainless Weld Cost

Full weld cost breakdown for 304 stainless steel using GTAW. ER308L filler, tri-mix gas consumption, and a narrative that explains the premium over carbon steel jobs.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

Structural Fabrication Cost/Ton

Fabrication cost analysis for a structural steel package — cost expressed per ton of steel for GC comparison. FCAW-G process, A36, mixed joint types.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

7018 Electrode Cost Sheet

Weld cost comparison for E7018 electrode across 3/16", 1/4", and 3/8" fillet sizes. Deposition rate, stub loss factor, and true cost-per-pound calculated.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

ER70S-6 Wire Cost Sheet

Wire cost analysis for ER70S-6 at .035" and .045" diameters. Deposition efficiency, spool waste, and breakeven comparison vs. SMAW on the same joint.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

Shielding Gas Cost Sheet

Gas cost breakdown comparing 75/25 Ar/CO2, 90/10, and straight CO2 for GMAW on structural steel. CFH vs. arc time — actual gas cost per 100 inches of weld.

See example
📄 Bid Template
StructuralBid Template

Structural Steel Bid Template

Clean structural steel fabrication bid template covering materials, weld labor, coating, and erection. GC-ready format — one contractor used this as their new standard.

See example
📄 Bid Template
StructuralBid Template

40-Ton Warehouse Bid

Bid document for a 40-ton structural steel warehouse package. Material breakdown by member type, shop labor estimate, and delivery allowance all structured and ready.

See example
📄 Bid Template
StructuralBid Template

Structural Change Order Template

Change order for added structural steel work on an existing building contract. Reason paragraph, line-item additions, revised schedule impact, and signature block.

See example
📄 Bid Template
StructuralBid Template

Structural Lump Sum Bid

Lump sum bid format for a structural steel subcontract — single bottom line with backup documentation. Used when GCs want a clean number and your detail stays internal.

See example
📄 Bid Template
PipeBid Template

Pipe Fabrication Bid Template

Pipe fabrication bid template covering spool pieces, weld count, and hydro testing. Used by a process piping shop to standardize their RFI response format.

See example
📄 Bid Template
PipeBid Template

O&G Pipe Bid Template

Oil and gas pipeline bid template with API 1104 compliance note and hydro test requirement. Field weld count, trench footage, and tie-in costs all structured.

See example
📄 Bid Template
PipeBid Template

Process Piping Bid Template

Process piping bid for a plant expansion — spool count by diameter, weld count by class, and NDE cost factored in. Issued to EPC and accepted same week.

See example
📄 Bid Template
AluminumBid Template

Aluminum Fabrication Bid Template

Aluminum fabrication bid covering extrusion material, TIG labor, and anodizing. Used by a marine fabrication shop for custom aluminum component work.

See example
📄 Bid Template
StainlessBid Template

Stainless Fabrication Bid Template

Stainless steel fabrication bid for pharmaceutical equipment. Material cert traceability note, passivation cost, and surface finish spec all in the bid body.

See example
📄 Bid Template
Sheet MetalBid Template

Sheet Metal Bid Template

Sheet metal fabrication bid covering flat pattern layout, press brake work, and TIG seam welding. Finish schedule and hardware allowance included.

See example
📄 Bid Template
StructuralBid Template

Misc Metals Bid Template

Miscellaneous metals bid for a commercial construction package — stairs, rails, embeds, and angles all on one quote. Standard format accepted by most GCs.

See example
📄 Bid Template
StructuralBid Template

Welding Service Bid Template

Time-and-material welding service bid template. Hourly rate, mobilization, and minimum call-out fee all structured — used for field repair and maintenance work.

See example
💲 Weld Cost Calc
StructuralWeld Cost Calc

CNC Plasma Cut Cost — ½" Carbon Steel, 14 Parts

1/2" A36 carbon steel, 24"×36" plate, 14 parts — plasma cut time and cost breakdown. Piercing (14 × 0.5s), cut time at 80 IPM, consumable amortization, and cost per part all computed. $0.14/in vs. $0.08–$0.22 industry range.

See example
💲 Weld Cost Calc
Sheet MetalWeld Cost Calc

Bend Deduction — 14ga Mild Steel U-Channel

2"×4"×2" U-channel in 14ga mild steel. Two 90° bends, r=0.125", K=0.38 from Machinery's Handbook. Flat blank = 7.686". Springback ≈ 2.5° per bend — over-bend to 87.5°.

See example
💲 Weld Cost Calc
Sheet MetalWeld Cost Calc

Box Enclosure Flat Blank — 4 Bends, 14ga Steel

Rectangular enclosure in 14ga mild steel — all 4 bends at 90°, 0.125" inside radius. Flat blank calculated with K=0.38 over four BD deductions. Total flat blank 14.343" from 4" × 6" box.

See example
💲 Weld Cost Calc
StainlessWeld Cost Calc

Stainless Bracket Flat Blank — 16ga, 90°

16ga 304 stainless 90° bracket, 3" × 2" legs, r=0.125". K=0.34 (stainless air-bend). BD=0.1664". Flat blank = 4.834". Springback ≈ 5° — stainless needs the most over-bending.

See example
📄 Inspection Checklist
StructuralInspection Checklist

AWS D1.1 Inspection — Structural Beam Package, 12 Welds

W14×53 beam-to-column connections on a mezzanine addition — 12 CJP groove welds inspected per Table 6.1. 11 passed, 1 rejected for undercut at 3/64" (limit 1/32"). Corrective action: grind and reweld toe.

See example
📄 Inspection Checklist
PipeInspection Checklist

AWS D1.1 Inspection — Pipe Rack Fillet Welds, 18 Welds

Pipe support rack in a refinery expansion — 18 fillet welds on A36 stanchions, cyclically loaded category. All 18 passed. Porosity check was the controlling criterion under cyclic rules — zero visible porosity accepted.

See example
📄 Inspection Checklist
StainlessInspection Checklist

AWS D1.1 Inspection — Stainless Tank, 8 Groove Welds

304 stainless storage tank, statically loaded. Eight CJP groove welds on ½" plate, GTAW process, WPS-SS-101. All 8 accepted — weld profile and fusion criteria were the inspector's primary focus on this material.

See example
📄 Inspection Checklist
StructuralInspection Checklist

AWS D1.1 Inspection — Structural Handrail, 6 Fillet Welds

OSHA-compliant handrail system, fillet welds at post-to-base-plate connections, 6 welds inspected. 5 passed. Weld W4 rejected for weld size under-run (3/16" leg where 1/4" required). Corrective weld added, re-inspection passed.

See example
📄 Inspection Checklist
AluminumInspection Checklist

AWS D1.2 Inspection — Aluminum Frame, 10 Groove Welds

6061-T6 aluminum structural frame for a conveyor support — 10 groove welds inspected per AWS D1.2 visual criteria. All 10 accepted. Inspector noted weld profiles were well-dressed; no crater or fusion issues observed.

See example
📄 Inspection Checklist
StructuralInspection Checklist

AWS D1.1 Inspection — Crane Runway, Cyclically Loaded, 24 Welds

Overhead crane runway girder modifications, cyclically loaded category. 24 fillet welds on W24×84 girders. 22 accepted. 2 rejected for porosity (cyclic limit: none visible). After grinding and reweld, re-inspection: all 24 accepted.

See example
📋 Quote Writer
StructuralQuote Writer

Structural Steel Takeoff — $34K Mezzanine

Itemized mezzanine steel takeoff: W10×22 main beams, bar grating, guardrail. 2,800 lbs, $34K. Shop fabrication and field erection separated. GC-ready.

See example
📄 Bid Template
StructuralBid Template

Welding Service Bid — $28K Field Package

Field welding service bid for a process plant: 6" pipe supports, structural platforms, misc attachments. 320 weld hours, mobilization, and per-diem included.

See example
📋 Quote Writer
Sheet MetalQuote Writer

HVAC Duct Fabricator Quote — $22K

HVAC sheet metal fabrication estimate: 2,400 lbs of duct and fittings in 18ga and 22ga Galv. 140 hrs shop fab, 40 hrs field install. Itemized by material + labor.

See example
📄 Bid Template
StructuralBid Template

Electrical Support Steel Bid — $22K

Electrical contractor hired a structural fab shop for miscellaneous steel supports: Unistrut racks, conduit hangers, equipment platforms. Itemized bid, $22K.

See example
📋 Quote Writer
PipeQuote Writer

Pipe Fabrication Takeoff — $31K

Process piping shopfab: 3" and 4" Sch 40 carbon steel spools, 38 weld joints. Material take-off, weld count, and field labor — $31K complete.

See example
📋 Quote Writer
StructuralQuote Writer

Roofing Steel Support Bid — $22K

Structural steel for standing-seam metal roof system: angle struts, purlin clips, attachment plates. 1,800 lbs, $22K. Sent to a roofing contractor who subbed out the structural.

See example

No examples match that combination.

Generate Your Own —
In Under 15 Minutes

14-day free trial. No credit card required. All 10 tools, unlimited outputs.

Start Free Trial $29/mo after trial. Cancel anytime via Stripe portal.