A Phoenix structural fabrication shop used IronKit to generate a mezzanine steel package quote for a warehouse distribution center. The GC wanted itemized line items by member type and installation phase — IronKit broke it out into shop fabrication (beam work, drilling, connections) and field erection (bolting, alignment, safety). The bid landed at $34,120 on a 2,800-lb mezzanine package. The GC sent the PO within two days.
Frequently Asked Questions
What does a structural mezzanine quote include?
Structural steel (W-shapes for beams and joists), bar grating, edge angles, base plates and anchor hardware, connection clips and bolts, shop fabrication labor, field erection labor, and primer. Engineering, concrete, and finish paint are always excluded.
How long does a mezzanine take to build?
From signed PO to delivery: 3–4 weeks for fabrication and primer. Erection on site takes 1–3 days depending on crew size and accessibility. Total 4–6 weeks for a warehouse mezzanine of this size.
Can I change the load rating in the quote?
IronKit generates the quote from the parameters you enter — member sizes, weight, labor hours. Adjust any field and the total recalculates automatically. No starting over.
Does this work for aMezzanine with a deck and rail?
IronKit covers the structural steel (beams, grating, guardrail posts). The deck surface is usually concrete or wood — that scope is separate. Guardrail, stairs, and access are covered under the same quote if you include them in the spec.